Skip links

How to Prepare Your Facility for a Lockout/Tagout Program

You’ve decided to build (or fix) your facility’s lockout/tagout program. The work goes faster, costs less, and turns out better when you walk in prepared. Here is what a LOTO consultant actually needs from you before the engagement starts, and what you can do now to make the onsite visit efficient.

This is the practical prep guide for a facility that’s ready to move. If you still need the background on what LOTO is and why Cal/OSHA requires it, start with our lockout tagout program services overview first.

Start With Your Equipment List

The biggest factor in any LOTO engagement is how many machines need procedures. So the first thing we ask for is an equipment list.

You don’t need a perfect inventory. A spreadsheet, or even a walk-through with a clipboard, works. For each piece of equipment, note:

  1. The equipment name or ID
  2. Where it sits in the facility
  3. What energy sources it uses (electrical, pneumatic, hydraulic, steam or thermal, mechanical, gravity)
  4. Whether it has a lockable disconnect, valve, or breaker

Here’s something we see on almost every job: facilities overcount. One client guessed around 500 machines. The real number, after we grouped identical equipment, was 61. Another estimated “a little over a hundred” and turned out to have 226 total, but more than half didn’t need a unique procedure. Identical machines share a procedure, so your scoped count is usually far smaller than your first guess. Getting the list down on paper is what makes that grouping possible.

Sort Out Who Does What

Cal/OSHA Title 8 §3314 splits your workforce into categories, and your training plan depends on getting this right. Two matter most:

  • Authorized employees perform the lockout. They shut equipment down, isolate energy, and apply the locks. They need hands-on training.
  • Affected employees work on or near equipment that gets locked out but don’t perform the lockout themselves. They need shorter awareness training.

Before the engagement, make a rough list of who falls into each group. You don’t have to be precise. It helps us scope training, and it tells us who should be available during the onsite visit.

Gather What You Already Have

If you have an existing LOTO program, pull it together along with any machine procedures, training records, and equipment manuals.

This matters even if the program is old or incomplete. Most existing programs we review were written to federal OSHA only and don’t mention Cal/OSHA §3314. That’s a fixable gap, not a reason to start over. Cal/OSHA goes further than the federal standard in a few specific ways, and §3314(l)(4) requires LOTO training documentation to align with your IIPP recordkeeping under §3203. Knowing what you already have lets us update rather than rebuild, which keeps the scope smaller.

Pick the Right Person to Walk the Floor

The onsite assessment runs on your escort. This is the person who walks the facility with our specialist and knows the equipment: usually a maintenance tech or operations lead.

A good escort knows where every disconnect, valve, and breaker is. That keeps us moving. With a knowledgeable escort, we can document roughly twice as many machines a day as we can without one. That affects both your cost and how long we’re on site. Pick someone who knows the floor, and block their time in advance.

Questions about getting your facility ready for a LOTO assessment? Call (925) 551-7300 or request a consultation. We’ll tell you exactly what to pull together for your equipment and walk you through the first visit.

What to Expect During the Onsite Visit

We work in two visits. On the first, our specialist comes to your facility, confirms the equipment count, identifies energy types, and builds a few sample procedures. We send those back so you can see the format before we produce the rest.

The bulk of the work happens on site, machine by machine. We photograph each one and its energy isolation points. Then we annotate the photos with arrows marking the exact button, switch, or valve, and write step-by-step instructions a new employee could follow. Text-only checklists can technically meet the standard, but they’re hard to actually use when someone new takes over the job. The photo-annotated, laminated version is what we deliver and place at each machine. You can see what the finished product looks like in our guide to equipment-specific LOTO procedures.

We give you a firm timeline with your quote.

What to Have Ready: A Checklist

Use this before your first call or onsite visit:

  • [ ] Equipment list with location and energy sources for each machine
  • [ ] Rough count of authorized vs. affected employees
  • [ ] Your current LOTO program, if you have one
  • [ ] Any existing machine procedures or training records
  • [ ] Equipment manuals for complex or multi-energy machines
  • [ ] A knowledgeable escort, with their time blocked for the visit
  • [ ] Access to the production floor and electrical and utility areas
  • [ ] A point of contact who can answer questions during the walk-through

The more of this you have ready, the tighter your scope and quote. For a breakdown of what moves the number, see what drives LOTO program costs.

Ready to schedule your lockout/tagout assessment? Call (925) 551-7300 or request a consultation. Tell us roughly how many machines you have and whether you’ve got an existing program, and we’ll scope a visit that fits your facility.

Trusted throughout California

  • US Foods client logo
  • Azenta client logo
  • Brooks client logo
  • Element Critical client logo
  • Admedes client logo
  • FS Precision Tech client logo
  • Western Colloid client logo
  • Endevco client logo
  • StoreDot client logo
  • Advantage Metal Products client logo
  • Levlad client logo
  • E-Fab client logo
BSY started working with CDMS last year after our in-house EHS person departed the company. CDMS reviewed our existing operational permits as well as any additional Federal, State and Local regulations that could apply and helped us to create a comprehensive compliance calendar to track regulatory deadlines and submittal due dates. The CDMS team does an excellent job of tracking everything and can be relied upon to complete the forms accurately and assist with submittals, allowing me to focus on our business.
Gerona Goethe · General Manager · Bay Ship

Speak with a CDMS EHS expert

Tell us about your facility and your deadline. You’ll get a clear read on what applies and a scoped plan to handle it.